← All expertise Expertise

Process improvement

Slow, error-prone planning work measured, redesigned and made standard.

Process mappingExcel/VBASAP PP
60 → 5–10 mindaily shortage report
6–7 h → ~1 hmonthly export plan

Day to day

Most of my improvements started with a daily or monthly task that took too long or kept going wrong. I measured it first, changed the process, then handed it over as the new standard.

  1. 01

    Automated the daily multi-source shortage report: about 60 minutes to 5–10 minutes per run.

  2. 02

    Rebuilt the monthly export plan around one input, with error-proofing that flags lot-size mismatches: 6–7 hours to about 1 hour, adopted as standard.

  3. 03

    Helped build an SAP framework for CKD/SKD export packing, raising packing capacity from 450 to 540 units a day.

  4. 04

    Reviewed safety stock across 3,000+ components, identifying ~PKR 50M of inventory that could be released.

  5. 05

    Modelled shift, overtime and solar-timing scenarios and took them to plant leadership.

How it runs

  1. Find the wasteWhere the same work repeats, waits or gets corrected.
  2. Measure the baselineTime, errors or stock, before anything changes.
  3. Change the processOne input, error-proofing, automation or a new SAP setup.
  4. Hold the gainTest, train, document, and make it the standard.

What I know

Find & measure

  • Where the waste iswork that repeats, waits or gets corrected
  • Baseline before changetime, errors or stock, measured first

Redesign

  • One validated inputentry in one place, with drop-downs and rules
  • Error-proofing (poka-yoke)lot-size mismatches flagged in the export plan
  • AutomationExcel, VBA and Power Query: shortage report 60 → 5–10 min
  • SAP setup changesexport packing framework: 450 → 540 units a day

Analyse

  • Scenario analysisshift, overtime and solar-timing options for plant leadership
  • Cost-benefitdisplaced energy valued with Finance
  • Inventory review~PKR 50M of safety stock identified for release

Hold the gain

  • Standard workexport plan adopted as the standard
  • Handovertested, trained and documented, known limits included

What I improved

Planning should turn complexity into action.

Open to Production Planner, Materials Planner, Production Controller and Supply Chain Planning roles in the UK.

ContactStraight to my inbox

Send me a message

Recruiter, hiring manager or just saying hello: I’ll reply to the email address you give here.