SAP PP

Super user for six departments on a live production line.

SAP PP (hands-on)SAP MM (exposure)S/4HANA preparation
6departments supported
450 → 540units packed a day (export packing)

Day to day

Central MRP runs sat with the planning function; my job was to read the outputs, check component availability and turn them into production decisions.

  • SAP PP super user for six departments: the person they came to when an order, BOM or routing didn’t behave.
  • Read MRP output in MD04, checked component availability and converted planned orders into production orders.
  • Released, changed and confirmed production orders, and ran monthly production closing.
  • Created work centres and maintained BOMs, routings and production versions.
  • Prepared and reviewed planning master data for the move from SAP ECC to S/4HANA.

What I know

The transactions I used, and what I used each one for.

Production orders

  • CO01Create orderreleasing the day’s lots to the line
  • CO02Change ordermoving quantities and dates when the plan changed
  • CO03Display orderchecking status and components
  • CO11NConfirmrecording output against each order
  • COOISOrder informationevery order’s status in one list

MRP & availability

  • MD04Stock / requirementsthe daily check, component by component
  • MD05MRP listwhat the last MRP run proposed
  • MD41Single-item, multi-levelplanning a finished bike down its BOM

BOMs

  • CS01–CS03Create, change, displaykeeping bills of materials right
  • CS11Multi-level explosionevery component a model needs
  • CS15Where-usedwhich models a short part will stop

Routings, work centres, versions

  • CA01–CA03Routingsoperations behind each order
  • CR01–CR02Work centrescreated and maintained for the lines
  • C223Production versionslinking BOM and routing for each model

Stock & movements

  • MB51Material documentstracing goods issues behind a variance
  • MB52Warehouse stocksstock by plant and storage location
  • MIGOGoods movementposting and checking receipts and issues

Material master

  • MM01–MM03Create, change, displaythe planning data each material carries

Concepts

Planned → production order conversionMRP elements & exceptionsBOM, routing & production version linksStock typesOutside processing (OSP)Monthly order closingECC → S/4HANA master data

What I improved

Smaller fixes

  • Implemented MRP for paint, welding wire and aluminium sheet, correcting inflated BOM usage rates.
  • Moved non-conforming stock to QI or Blocked so shortage figures counted usable supply only.

Planning should turn complexity into action.