Production & Materials Planning · SAP PP

Production plans that keep the line running.

I’m Syed Ahmad Kamal. At Atlas Honda, I planned a 4,650-unit daily motorcycle build programme and built tools that made shortage and export planning faster.

SAP PP · Production control · MRP & materials · Capacity planning · Forecasting · Excel/VBA automation

Based in
Bromsgrove, UK
UK work status
Authorised to work full-time
Seeking
Production, materials & supply chain planning
Syed Ahmad Kamal
4,650motorcycles a day, planned
~1,100parts watched for shortages
Best Academic Practice AwardBest student of the year · MSc, NTU 2025/26
Experience across
Atlas HondaSainsbury’sNottingham Trent University MScScania MSc research200+ freelance clients
01Impact

What changed on the line

Before and after figures from my work at Atlas Honda. Each one is labelled as implemented, an operational result, identified or a proposal.

All projects →
Implemented

Daily shortage report

5–10minutes per run

Daily preparation time for the shortage report covering about 1,100 actively monitored parts.

60 minbefore, every day
10+ hmanual work removed a week
Shortage monitoring case study →
Implemented

Monthly export plan

Preparation time for the same planner, one block per hour. The rebuilt model was adopted as the standard.

Export planning case study →
Operational result

Export packing

+20% units packed per day

Identified

Safety stock review

~PKR 50Minventory identified for potential release
  • Old safety stock
  • New level
  • Released stock

3,000+ components assessed

Proposal

Capacity scenarios

One day-level calendar, five operating options. The model finds the lightest option that still meets the month’s requirement.

Illustrative heights. Internal figures are not published. Capacity model case study →
Proposal

Split overtime between shifts

  • Shift
  • Overtime
  • Shared van run

Line 2’s day shift stays on until Line 1’s overtime ends, so both go home on the vans that bring Line 2’s night shift in. The night shift runs until the morning vans arrive to take it home.

2 linesfinish overtime together
Same fleeteach run takes one team home, brings the next
Shift and overtime case study →
03Recommendations

What managers and professors say

Named recommendations from my national manager at Atlas Honda and two Nottingham Trent University academics.

I had the pleasure of working with Ahmad Kamal, a dedicated and motivated professional with a strong learning attitude. He consistently demonstrated responsibility, teamwork, and a willingness to take on new challenges.

UMUsman MalikNational Manager, PPC · Atlas HondaManaged Syed directly · via LinkedIn ↗

Throughout the project, Syed demonstrated strong analytical and problem-solving skills, particularly in identifying operational issues and developing practical recommendations for improving production performance.

SSDr Sharizal Ahmad SobriSenior Lecturer & MSc Course Leader · NTUMSc dissertation supervisor · via LinkedIn ↗

One of Syed’s key strengths is his ability to apply theoretical concepts to real-world scenarios… His work on Gantt charts, project scheduling, and risk management was precise and showed his attention to detail.

EHDr Elif Çirkin HawkinsPhD, FHEA · Nottingham Trent UniversitySyed’s professor · via LinkedIn ↗

Planning should turn complexity into action.

Open to Production Planner, Materials Planner, Production Controller and Supply Chain Planning roles in the UK.

ContactStraight to my inbox

Send me a message

Recruiter, hiring manager or just saying hello: I’ll reply to the email address you give here.